NEW CENTURY ELECTRIC, INC.
|
COMPLETED PROJECTS AND MARKETS SINCE 1998
|
| Completed Federal/State/Government Projects |
| PROJECT NAME |
DESCRIPTION |
LOCATION |
| STATE OFFICE BUILDING |
POWER UPGRADES |
WATERTOWN |
| 342 NYS DOT/OGS |
POWER UPGRADES |
WATERTOWN |
| 342 NYS DOT GENERATOR/OGS |
BACK UP GENERATOR INSTALL |
WATERTOWN |
| WATERTOWN CORRECTIONAL FACILITY/OGS |
POWER UPGRADES |
WATERTOWN |
| CAPE VINCENT FERRY CROSSING |
PLATE READER SYSTEM |
CAPE VINCENT |
| GIA PHASE II LAND PORT OF ENTRY |
POWER DISTRIBUTION MODS |
ALEXANDRIA BAY |
| AUBURN CORRECTIONAL FACILITY/CORE CLIMATE |
TEMPERATURE CONTROL |
AUBURN |
| ONONDAGA COUNTY WATER AUTHORITY/SIEMENS |
TEMPERATURE CONTROL |
ONONDAGA |
| RADIAN INTERNATIONAL/FT DRUM |
INSTALLATIONS |
FORT DRUM |
| AMERICAN RATED CABLE & COMM. |
INSTALLATIONS |
FORT DRUM |
| FORT DRUM 2002 VAC SWITCH |
POWER DISTRIBUTION MODS |
FORT DRUM |
| FORT DRUM FIBER/PHONE PHASE 1 |
INSTALLATIONS |
FORT DRUM |
| FORT DRUM FIBER/PHONE PHASE 2 |
INSTALLATIONS |
FORT DRUM |
| FORT DRUM DOC/HQ HEAT TRACE |
ROOF SYSTEM HEAT TRACE |
FORT DRUM |
| SHAW BENENCO FT DRUM |
EMERGENCY POWER INSTALL |
FORT DRUM |
| FORT DRUM #2119 VAC SWITCH |
POWER DISTRIBUTION MODS |
FORT DRUM |
| RADIAN INTERNATIONAL/FT DRUM |
INSTALLATIONS |
FORT DRUM |
| FORT DRUM #3054 VAC SWITCH |
POWER DISTRIBUTION MODS |
FORT DRUM |
| FORT DRUM #3045 EM GENERATOR |
GENERATOR INSTALLATION |
FORT DRUM |
| FORT DRUM #3046 EM GENERATOR |
GENERATOR INSTALLATION |
FORT DRUM |
| MEDDAC BLDG/PURCELL CONST |
NEW CONSTRUCTION |
FORT DRUM |
| AMERICAN RATED CABLE & COMM. |
INSTALLATIONS |
FORT DRUM |
| CADENCE 8000 AREA VAC SWITCH & TRANSF |
POWER DISTRIBUTION MODS |
FORT DRUM |
| CAPE ENVIR. TRANSFORMER/REMED SYSTEM |
WELL & TRAILER POWER SERVICES |
FORT DRUM |
| FORT DRUM DAAG FACILITY |
TEMPERATURE CONTROL |
FORT DRUM |
| ACTUS LEND LEASE |
POWER DISTRIBUTION MODS |
FORT DRUM |
| UMCS BASS PROJECT/SIEMENS |
TEMPERATURE CONTROL |
FORT DRUM |
| MASS NOTIFICATION SYSTEM |
GIANT VOICE WIRELESS SYSTEM |
FORT DRUM |
| RADIO TOWERS/LMR MANAGEMENT |
POWER & COMM SYSTEMS |
FORT DRUM |
| AREA 1795/CAPE ENVIR. REMEDIATION |
FORT DRUM GATE ACCESS SYSTEM |
FORT DRUM |
| CAPE ENVIR AREA 1795 |
WELL & TRAILER POWER SERVICES |
FORT DRUM |
| COMMONS MNS/PURCELL CONST |
NEW CONSTRUCTION |
FORT DRUM |
| CAPE ENVIR AREA 1490 |
WELL & TRAILER POWER SERVICES |
FORT DRUM |
| OASIS FUEL POINT/EA ENGINEERING |
MONITORING AND EXTRACTION WELL POWER |
FORT DRUM |
| AREA 3805/CAPE ENVIR. REMEDIATION |
WELL & TRAILER POWER SERVICES |
FORT DRUM |
| AREA 1490/CAPE ENVIR. NEW FUEL POINT |
WELL & TRAILER POWER SERVICES |
FORT DRUM |
| FORT DRUM DENTAL CLINIC/SLR CONTRACT. |
NEW 24-PATIENT DENTAL CLINIC |
FORT DRUM |
| METERING PROJECT/SIEMENS GOV’T SERV. |
GAS & ELECTRIC METERING |
FORT DRUM |
| RADIO TOWERS/LMR MANAGEMENT |
POWER & COMM SYSTEMS |
FORT DRUM |
| OASIS PILOT STUDY/EA ENGINEERING |
WELL & TRAILER POWER SERVICES |
FORT DRUM |
| 4400 AREA/CHUGACH |
POWER UPGRADES |
FORT DRUM |
| SMALL BUILDING CONTROL PROJECT/SIEMENS |
TEMPERATURE CONTROL |
FORT DRUM |
| GIANT VOICE PHASE II/CHUGACH |
GIANT VOICE WIRELESS SYSTEM |
FORT DRUM |
| P-1008 LOCATION/ALUTIIQ |
POWER UPGRADES |
FORT DRUM |
| RADIO TOWERS/LMR MANAGEMENT |
POWER & COMM SYSTEMS |
FORT DRUM |
| TIMBERS VAC SWITCH/ALUTIIQ |
POWER DISTRIBUTION MODS |
FORT DRUM |
| OASIS POWER SYSTEM/EA ENGINEERING |
POWER DISTRIBUTION MODS |
FORT DRUM |
| FORT DRUM 10660 VMF/CHUGACH |
VEHICLE MAINTENANCE UPGRADE |
FORT DRUM |
| FORT DRUM BURGER KING/SIEMENS |
TEMPERATURE CONTROL |
FORT DRUM |
| ****CONTACT US FOR MORE REFERENCES OR CONTACT INFORMATION**** |